又湿又紧又大又爽a视频国产,亚洲国产精品一区二区久久hs,亚洲中文字幕日产乱码高清app,欧美性猛交xxxx富婆,人人妻人人澡人人爽欧美一区九九,色偷偷av一区二区三区,久久久精品人妻一区二区三区蜜桃,精品丝袜人妻久久久久久,亚洲国产中文在线二区三区免,精品人妻一区二区三区四区

        濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
        新聞
        聯(lián)系我們
        咨詢電話
        15866735826

        聯(lián)系:張經(jīng)理

        手機: 15866735826

        郵箱: 394441862@qq.com

        網(wǎng)址:http://www.7x24taxi.net/

        地址:山東省濟南市章丘圣井工業(yè)園

        當前位置: 首頁 > 新聞中心 > 公司新聞

        木工加工棚的施工設置內(nèi)容點

        來源:http://www.7x24taxi.net/   發(fā)布時間:2022-10-20

        木工加工棚是為了保護施工現(xiàn)場的施工人員,用鋼管作為支撐框架,用竹簽或竹笆板或廢棄模板覆蓋作為防砸,或保護高壓線等穿過木工加工棚的東西。下面來講講木工加工棚的施工設置內(nèi)容點。
        The woodworking shed is designed to protect the construction personnel at the construction site. Steel pipes are used as the support frame, bamboo sticks, bamboo fence boards or waste templates are used to cover the woodworking shed to prevent smashing, or high-voltage lines and other things passing through the woodworking shed are protected. Next, we will talk about the safe construction setting of the woodworking shed.
        一般雙層保護是為了增加系數(shù),鋼筋加工棚和通道均為木工加工棚,部分木工加工棚建在塔吊覆蓋的辦公和生活區(qū)。木工加工棚是建筑施工過程中操作人員或人行的必經(jīng)通道,過往人員的木工加工棚為雙層。
        Generally, the double-layer protection is to increase the safety factor. The steel bar processing shed and the safe passage are both woodworking sheds. Some woodworking sheds are built in the office and living areas covered by tower cranes. The woodworking shed is a necessary passage for operators or pedestrians during the construction process, and the woodworking shed for passers-by is double-layer.
        從懸挑腳手架的懸挑處開始,每隔十米設置一個木工加工棚,可以更好地保證木工加工棚下行走人員的。在施工過程中,在搭建木工加工棚時注意防護措施,施工人員按照施工要求進行施工,露天攪拌機位置、現(xiàn)場混凝土攪拌機、卷揚機棚、鋼筋棚、木棚、部分出入口和現(xiàn)場廁所需要設置木工木工加工棚。
        Starting from the cantilever of the cantilever scaffold, a woodworking shed shall be set every ten meters to better ensure the safety of people walking under the woodworking shed. During the construction, pay attention to the protective measures when setting up the woodworking processing shed. The construction personnel shall carry out the construction according to the construction requirements. The woodworking processing shed shall be set up at the location of the outdoor mixer, the site concrete mixer, the winch shed, the reinforcement shed, the wood shed, some entrances and exits and the site toilet.
        木工加工棚
        水平保護安裝和拆除前,進行技術(shù)交底。高空作業(yè)人員經(jīng)過專門的技術(shù)培訓和專門的考試,并持證上崗。木工加工棚使用的鋼管、扣件等材料符合JGJ130-2011《建筑施工扣件式鋼管腳手架技術(shù)規(guī)范》及相關(guān)標準的要求。
        Safety technical disclosure shall be conducted before installation and removal of horizontal protection. High altitude operation personnel shall receive special technical training and examination, and take up their posts with certificates. The steel pipes, fasteners and other materials used in the woodworking shed shall meet the requirements of JGJ130-2011 Technical Code for Safety of Coupled Steel Pipe Scaffolds in Building Construction and relevant standards.
        安裝和拆除水平木工加工棚時,操作人員的“三寶”齊全并正確使用。木工加工棚搭設和拆除時,應避免上下同時作業(yè),錯開作業(yè)時間。安裝和拆除木工加工棚時,所有材料和工具應堆放在建筑物外緣少2m處,堆放高度不得超過1m。
        When installing and removing the horizontal woodworking shed, the operator's "three safety precautions" shall be complete and used correctly. When erecting and dismantling the woodworking shed, it shall be avoided to work up and down at the same time and stagger the operation time. When installing and removing the woodworking shed, all materials and tools shall be stacked at least 2m away from the outer edge of the building, and the stacking height shall not exceed 1m.
        拆除的材料及時傳遞到地面并運走,嚴禁高空拋擲。建造和拆除木工加工棚時,應在地面上設置警戒區(qū),并派專人監(jiān)控。建造和拆除木工加工棚時,應指定專人指揮。
        The dismantled materials shall be delivered to the ground and transported away in time, and it is strictly prohibited to throw them at high altitude. When building and removing the woodworking shed, a warning area should be set on the ground and a special person should be assigned to monitor it. When building and dismantling the woodworking shed, a specially assigned person shall be assigned to command.
        管理人員應注意眼、腿、口,采取有效的防護措施應對危險情況,確保人員。在雨天和大風天氣,應暫停木工加工棚的搭設和拆除,并檢查和維護木工加工棚的質(zhì)量。
        The management personnel shall pay attention to the eyes, legs and mouths, and take effective safety protection measures to deal with the dangerous situations and ensure the safety of personnel. In rainy and windy days, the erection and removal of woodworking shed shall be suspended, and the quality of woodworking shed shall be inspected and maintained.
        木工加工棚搭設完成后,經(jīng)專職員驗收合格后方可投入使用。在搭設和拆除水平防護前,進行技術(shù)交底。關(guān)注我們http://www.7x24taxi.net,為你講解更多的相關(guān)內(nèi)容事項!
        After the woodworking shed is erected, it can be put into use only after being accepted by the full-time safety officer. Safety technical disclosure shall be conducted before erection and removal of horizontal protection. Follow us http://www.7x24taxi.net , explain more relevant contents for you!

        亚洲国产精品无码久久久秋霞1| 毛片免费观看| 亚洲日韩av一区二区三区四区| 男女肉粗暴进来动态图| 丰满女人又爽又紧又丰满| 国内精品伊人久久久久777| 午夜精品久久久久久| 久久夜色精品国产噜噜| 亚洲av综合色区无码专区桃色| 国产亚洲av片在线观看播放| 亚洲中文字幕无码中文字| 美女视频黄频a免费| 国产国产精品人在线视| 天天摸夜夜添狠狠添高潮出水| 日韩精品人妻系列无码专区| 久久久国产一区二区三区| 欧美亚洲国产一区二区三区| 亚洲国产欧美在线人成| 色噜噜狠狠成人中文综合| 欧美性色黄大片www喷水| 久热这里只有精品12| 久久久久免费看成人影片| 色狠狠色婷婷丁香五月| 亚洲欧美一区二区成人片| 国产成人av乱码在线观看| 免费人妻精品一区二区三区| 文中字幕一区二区三区视频播放| 成全在线电影在线观看| 日韩av无码一区二区三区| 久久国产精久久精产国| 久久久精品一区aaa片| 亚洲av鲁丝一区二区三区| 无码一区二区波多野结衣播放搜索| 色妞www精品视频| 91日韩在线| 国产精品第八页| 色综合av综合无码综合网站| 三级国产三级在线| 亚洲色欲久久久综合网东京热| 久久精品国产免费播| 免费无遮挡禁18污污网站|