又湿又紧又大又爽a视频国产,亚洲国产精品一区二区久久hs,亚洲中文字幕日产乱码高清app,欧美性猛交xxxx富婆,人人妻人人澡人人爽欧美一区九九,色偷偷av一区二区三区,久久久精品人妻一区二区三区蜜桃,精品丝袜人妻久久久久久,亚洲国产中文在线二区三区免,精品人妻一区二区三区四区

        濟南蓬發(fā)建材有限公司為您提供臨邊護欄、木工防護欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
        新聞
        聯(lián)系我們
        咨詢電話
        15866735826

        聯(lián)系:張經(jīng)理

        手機: 15866735826

        郵箱: 394441862@qq.com

        網(wǎng)址:http://www.7x24taxi.net/

        地址:山東省濟南市章丘圣井工業(yè)園

        當(dāng)前位置: 首頁 > 新聞中心 > 行業(yè)動態(tài)

        圍擋施工的計劃分為幾個步驟

        來源:http://www.7x24taxi.net/   發(fā)布時間:2022-07-31

        目前圍擋的使用在市政各種項目施工是必不可少的建筑材料了,地鐵施工、道路施工等項目使用都相當(dāng)普遍。那么圍擋施工的計劃分為幾個步驟具體是啥呢?
        At present, the use of fencing is an essential building material in the construction of various municipal projects, and it is quite common in subway construction, road construction and other projects. So the plan of enclosure construction is divided into several steps. What is the specific step?
        1:先將需要施工的面積進行規(guī)劃,并且做出大致框架,普通為輕鋼龍骨鋪設(shè)鍍鋅鐵皮,或者用廢品輕鋼廢品圍擋,或者是使用定樁將大致的安裝路線分布出來。
        1: First, plan the area to be constructed and make a rough framework. Generally, lay galvanized iron sheet for light steel keel, or fence with waste light steel waste, or use fixed piles to distribute the rough installation route.
        2:在安裝的時候一定要依次進行安裝,這樣可以讓各個連接處都進行兼容,避免中途出現(xiàn)了縫隙或者是連接不上的問題出現(xiàn)。
        2: The installation must be carried out in turn during installation, so that all connections can be compatible, so as to avoid the problem of gap or lack of connection in the middle.
        3:燕尾絲或者U型射釘停止依次固定(固定間距以30-50cm),邊緣與各個連接處的固定都應(yīng)該相對密集一點,這也是為了讓其有一個較長的使用壽命。
        3: The dovetail wire or U-shaped shooting nail shall be fixed in turn (the fixed spacing is 30-50cm), and the fixing of the edge and each connection shall be relatively dense, which is also to make it have a long service life.
        安裝步驟地面硬化---膨脹螺絲固定立柱---組裝圍擋板與上下橫桿---圍擋板與立柱拼裝成型(保證橫平豎直)---基礎(chǔ)墻砌磚加固---基礎(chǔ)粉刷黃黑交替警示漆。
        Installation steps: ground hardening - expansion screws fix the column - assemble the baffle and upper and lower cross bars - assemble the baffle and column into shape (ensure horizontal and vertical) - bricklaying and reinforcement of the foundation wall - Foundation painting yellow and black alternating warning paint.
        圍擋的高度、材料、布置、粉飾都有一定的規(guī)格,例如要求工地圍擋高度不能小于2.5m;一般路段不低于1.8m。
        There are certain specifications for the height, material, layout and decoration of the fence, for example, the height of the fence on the construction site should not be less than 2.5m; Generally, the road section is not less than 1.8m.
        圍擋施工
        市政工程金屬圍擋板統(tǒng)一為藍(lán)色或綠色,房建工程施工圍墻統(tǒng)一為白色;工地大門要與圍擋協(xié)調(diào),并設(shè)置企業(yè)標(biāo)志牌,門側(cè)圍擋要架設(shè)式樣規(guī)范的“五牌一圖”,進出現(xiàn)場的主要道路要硬化和綠化。對因特殊情況不能設(shè)置圍擋的,則要求必須設(shè)置警示標(biāo)志。
        The metal fence of municipal engineering is blue or green, and the construction fence of housing engineering is white; The gate of the construction site shall be coordinated with the enclosure, and the enterprise signboard shall be set up. The enclosure at the side of the door shall be erected with "five signboards and one drawing" of standardized style, and the main roads entering and leaving the site shall be hardened and afforested. For those that cannot be barricaded due to special circumstances, safety warning signs must be set.
        圍擋高度為5米高,主體結(jié)構(gòu)采用槽鋼及角鋼焊接,立柱基礎(chǔ)為鋼筋混凝土加預(yù)埋鋼板加地腳螺栓;風(fēng)荷載按8級風(fēng)考慮;立柱間距不大于3米,槽鋼具體型號及壁厚根據(jù)計算結(jié)果確定。
        The height of the enclosure is 5 meters, the main structure is welded with channel steel and angle steel, and the column foundation is reinforced concrete plus embedded steel plates and anchor bolts; Wind load is considered as grade 8 wind; The spacing between columns shall not be greater than 3 meters, and the specific model and wall thickness of channel steel shall be determined according to the calculation results.
        廣告體距地面500mm;所有槽鋼、角鋼、鋼板等金屬構(gòu)件,必須經(jīng)防銹、防腐處理;立柱基礎(chǔ)混凝土標(biāo)號不低于C25,埋深不少于500。
        The advertising body is 500mm away from the ground; All channel steel, angle steel, steel plate and other metal components must be treated with rust and corrosion prevention; The concrete grade of column foundation shall not be lower than C25, and the buried depth shall not be less than 500.
        圍擋施工的計劃分為幾個步驟就是以上相關(guān)內(nèi)容了,如果您對其有疑問的話不妨來我們網(wǎng)站http://www.7x24taxi.net咨詢了解吧。
        The plan of enclosure construction is divided into several steps, which is related to the above content. If you have any questions about it, you may wish to come to our website http://www.7x24taxi.net Consult and understand.

        久久精品无码精品免费专区| 欧美日韩综合在线视频| 日韩精品无码久久一区二区三| 乱子轮熟睡1区| 成人免费视频一区二区| 一本大道av伊人久久综合| 日韩av午夜在线观看| 精品久久久久久无码专区不卡| 18禁免费无码无遮挡不卡网站| 国产精品麻豆va在线播放| 国产av无码专区亚洲av蜜芽| 97精品人妻系列无码人妻| 日本一二三区视频在线| 内射无码专区久久亚洲| 欧美性大战久久久久久久| 日本强好片久久久久久aaa| 久久99精品久久久久子伦| 水蜜桃视频免费资源在线| 美腿丝袜国产精品第一页| 青青免费在线视频| 国产无码精品三区| 日韩欧美激情兽交| 日韩精品在线看| 成人性生交大片免费看| 亚洲欧美不卡高清在线观看| 久久久久久久综合狠狠综合| 成人乱码一区二区三区四区| 国产成人久久综合二区| 久久这里只有精品视频99| 在线观看av片| 影音先锋国产精品无码| 少妇的肉体在线观看| 久久精品久久电影免费理论片| 亚洲AV无码成人网站含羞草| 国产啪精品视频网站| 少妇高潮无套内谢麻豆传| 国模叶桐尿喷337p人体| 国产亚洲3p无码一区二区| 人妻va精品va欧美va| 亚洲综合色无码| 久久综合狠狠色综合伊人|